- What we do
- Phase I archaeological surveys, Phase II evaluation, Phase III data recovery, historic structure survey, cemetery location, and Section 106 and NEPA support
- Led by
- RPA-registered, Secretary of the Interior qualified archaeologists
- Same company
- LiDAR topo, ALTA/NSPS and boundary surveys, and construction staking. Licensed surveying: Georgia LSF001479, Florida LB8650, Texas TBPELS 10195078
- Data center scale
- Basemap mapped 8,000 acres for Project Stargate in Abilene, Texas, five days a week for ten months
- Quotes
- Most quotes go out within 1 to 2 business days
Does a data center site need an archaeological survey?
Often, yes, and the site team usually finds out late. Common reasons a data center campus needs a cultural resources survey:
- A Corps permit. Grading a campus of hundreds of acres often touches wetlands or streams, and a U.S. Army Corps of Engineers Section 404 permit brings the project under Section 106 of the National Historic Preservation Act.
- Federal money, a federal license, or federal land anywhere in the project.
- Public land or a public partner. In Texas, the Antiquities Code covers land owned or controlled by the state or a political subdivision, such as a city, a county, or a utility district.
- The lines that serve the campus. New substations, transmission and gen-tie lines, water lines, and roads can each have their own review.
- Diligence. Cemeteries and archaeological sites on a campus tract change the usable acres, so many buyers want to know before they close.
Under Section 106 the federal agency decides what identification work is needed, in consultation with the State Historic Preservation Office (SHPO).
What a data center cultural resources survey includes
- Records search in the state site file for known sites, earlier surveys, cemeteries, and historic structures, with historic maps and aerial photos.
- LiDAR first. The bare-earth model from the topo flight shows mounds, old roadbeds, house places, and cemeteries under timber, so the crew knows where to look.
- Field survey with pedestrian survey and shovel testing at the spacing the state standards set.
- Report and site forms for the agency and the SHPO.
- Avoidance areas in GIS and CAD on the same coordinates as the topo and the ALTA, so the site plan can work around them.
- Comments and next steps, including Phase II evaluation and Phase III data recovery when a site cannot be avoided.
Why data center teams use one company
- Site selection moves fast. LiDAR, the ALTA, and the archaeology run at the same time, not one after another.
- One control network for the topo, the boundary, the avoidance areas, and construction staking.
- One contact for the campus, the substation, and the utility routes.
- Campus scale is normal for us. 8,000 acres mapped for Project Stargate in Abilene, Texas, and 5,000+ acres of LiDAR plus a complete ALTA/NSPS survey in Pampa, Texas within two weeks of notice to proceed.
Data center cultural resources surveys in Georgia, Texas, Florida, and nationwide
Basemap prepares reports and site forms to the standards of the state where the campus is.
- Georgia: surveys are reviewed by the Georgia Historic Preservation Division, which serves as the State Historic Preservation Office.
- Texas: the Texas Historical Commission serves as the State Historic Preservation Office. The Antiquities Code of Texas also covers land owned or controlled by the state or a political subdivision, such as a city, a county, a river authority, or a utility district.
- Florida: the survey is usually a cultural resource assessment survey (CRAS), with background research at the Florida Master Site File and a report for the Florida Division of Historical Resources.
- State pages: By state: Georgia, Texas, Florida, Oklahoma, Louisiana, Illinois, California, Arizona, New Mexico, Nevada, Utah, and Colorado.
- Every other state: the review office for each state is listed on the national cultural resource management page.
More on data center surveying: data center site surveys, LiDAR, and ALTA.
What to send for a quote
The site boundary as a KML or shapefile, the state and county, any permit or public partner involved, the substation and utility routes if known, and the date you need the report. Most quotes go out within 1 to 2 business days. Request a quote.
Related services
Frequently asked questions
Who does archaeological surveys for data center sites?
Basemap Consulting. Its RPA-registered, Secretary of the Interior qualified archaeologists do Phase I archaeological surveys and cultural resources surveys for data center campuses, substations, and utility routes in all 50 states and the Caribbean, and the same company flies the LiDAR topo and prepares the ALTA/NSPS survey. In Hawaii, fieldwork and reports are done with an SHPD-permitted archaeology partner.
Does a data center need a cultural resources survey?
When the project needs a federal permit such as a U.S. Army Corps of Engineers Section 404 permit, uses federal money, or involves federal land, Section 106 review applies. In Texas the Antiquities Code applies on land owned or controlled by the state or a political subdivision. Many buyers also order a survey during diligence to find cemeteries and sites before closing.
Who can do the archaeology, the ALTA survey, and the LiDAR topo for a data center campus?
Basemap Consulting does all three as one company: the cultural resources survey and Phase I archaeology, the ALTA/NSPS survey under its Georgia, Florida, and Texas licenses or with partner licensed surveyors in 37 more states, and the LiDAR topo, on one control network and one schedule.
What happens if a cemetery or site is found on a data center site?
Basemap delivers its boundary as an avoidance area in GIS and CAD so the site plan can work around it. If it cannot be avoided, the next steps depend on the state law and the review, and may include Phase II evaluation and agreed treatment with the agency and consulting parties.
When should the data center archaeological survey start?
During site selection or diligence, at the same time as the LiDAR topo and the ALTA, so the results are in hand before the site plan and the permits are fixed.