Phase I archaeological survey for development projects

A Phase I archaeological survey finds out whether a project area holds archaeological sites, through background research, fieldwork, and a report for the agency that reviews the project. Basemap Consulting does Phase I archaeological surveys for developers, EPCs, permitting leads, and landmen across the United States, including Hawaii (with an SHPD-permitted archaeology partner for fieldwork and reports), and the Caribbean. The same team flies the drone LiDAR and does the licensed surveying, so the findings fit the site layout.

What it is
The first, identification stage of archaeology: records research, a field survey with shovel testing, and a report
Who it is for
Developers, EPCs, permitting leads and landmen on solar, data center, battery storage, pipeline and transmission projects
Led by
RPA-registered, Secretary of the Interior qualified archaeologists
Same team
Drone LiDAR, survey control and licensed surveying: Georgia LSF001479, Florida LB8650, Texas TBPELS 10195078
Where
All 50 states and the Caribbean. In Hawaii, fieldwork and reports are done with an SHPD-permitted archaeology partner
To start
The boundary as a KML or shapefile, the state and county, the permit or funding behind the review, the layout and the schedule

What is a Phase I archaeological survey?

Phase I is the identification stage. The goal is to find and record the archaeological sites a project could affect. You may see it written as a Phase 1 archaeological survey, a Phase one archaeological survey, or a Phase I cultural resources survey. They all mean the same stage of work.

A cultural resources survey can be wider than archaeology and also cover historic buildings and structures. In Florida the work is usually part of a cultural resource assessment survey, or CRAS, which covers archaeological sites as well as historic buildings and structures. A CRAS also evaluates whether what is found may be eligible for the National Register of Historic Places, and Phase II testing can follow when the survey cannot settle that. Texas agencies spell it "archeological survey". Whatever name is on the request, the scope should say which resources, which survey area, and which review standards apply.

When is an archaeological survey required?

A federal connection is the most common reason. Section 106 of the National Historic Preservation Act applies when a project needs a federal permit, federal funding, or a federal license, or sits on federal land, and the work could affect historic properties. A U.S. Army Corps of Engineers Section 404 permit is a common trigger on private land. The federal agency decides what identification work is needed, in consultation with the State Historic Preservation Office (SHPO), so a federal connection does not mean the same field survey everywhere.

State and local rules can also call for a survey. The national cultural resource management page lists the review office state by state. Some lenders and developers also ask for an archaeological survey as due diligence before they buy land or commit to a design.

For a solar farm, a data center, or a battery storage site, it pays to settle the review path while the layout can still move.

What happens during a Phase I survey?

  1. Background research and records search. The archaeologist reviews recorded sites, earlier surveys, historic maps, aerial images, and the history of the land, and confirms the survey limits and the methods that apply.
  2. Field survey. The crew walks the ground on a set pattern. A pedestrian survey looks at exposed surfaces. A shovel test survey samples the soil for buried evidence. The archaeologist sets the mix and the spacing from the state standards, the ground, and how likely each landform is to hold sites. Deep testing can be needed where deposits may lie below the reach of a shovel test, such as on a floodplain.
  3. Analysis and report. The report sets out the methods, the coverage, what was found, the site boundaries, and the recommendations, with the site forms and maps the state asks for.
  4. Agency review. The report goes to the reviewing agency and comments are answered. Under Section 106 the federal agency makes the findings for the project, in consultation with the SHPO and the other consulting parties. The end of fieldwork is one stage of that process, not the last one.

How long does a Phase I archaeological survey take?

It depends on the acreage, the ground, and the review. Plan the schedule in stages rather than as one number:

Start from the permit or financing date and work backward through those stages. Access permissions, thick vegetation, weather, hard ground, deep testing, and newly found sites can add field time. Artifact analysis, report requirements, agency workload, and consultation can add time after the crew leaves. A changed layout can add survey area.

Ask for a schedule that separates the consultant's work from the agency's review. Basemap is built to be fast on the part we control: LiDAR is flown before fieldwork so the crew knows where to look first, and the mapping, the survey, and the archaeology are managed as one project on one schedule.

What drives the cost of a Phase 1 archaeological survey?

The scope drives the cost: the acreage, the ground cover, the access, the shovel test spacing the state standards call for, any deep testing, the number of sites found, and what the report must contain. A corridor with many landowners and work areas needs a different plan from one open parcel. Compare proposals on the same survey limits, the same methods, and the same deliverables. A comparison by acreage alone can hide a difference in coverage.

The larger cost is a survey that comes late or does not pass review. That can put a closing or a notice to proceed at risk, and bring redesign, crews and equipment on standby, repeat fieldwork, and a revised report. A survey that is scoped to the review standards and done right the first time protects the development schedule.

What happens if archaeological sites are found?

Finding a site starts a decision, not a stop. The first question is whether the layout can avoid it. Basemap delivers the site boundaries as GIS avoidance boundaries, so the engineers can test changes to arrays, roads, pads, trenches, or a route.

Phase I identifies sites and can make first recommendations. When a site cannot be avoided and more evidence is needed, a Phase II evaluation tests whether it may be eligible for the National Register of Historic Places. A find does not by itself mean Phase II is required. If an eligible site would be harmed, the agency and the consulting parties look at avoidance, minimization, and mitigation. Phase III data recovery is one agreed treatment when a site cannot be avoided. It is not an automatic next step.

Basemap's archaeologists carry a project through all three phases. More on the cultural resource management page.

Why fly LiDAR first and use one survey control network?

LiDAR flown before the fieldwork gives the archaeologists a bare-earth view of the ground under the trees. Surface features such as mounds, old roadbeds, terraces, and foundations help the crew plan where to look first. LiDAR supports the field methods the standards require. The subsurface testing the standards call for is still done on the ground. See archaeological LiDAR.

Basemap is a licensed surveying firm in Georgia (LSF001479), Florida (LB8650), and Texas (TBPELS 10195078), and works with partner licensed surveyors in 37 more states. So the LiDAR topo, the survey control, the boundary, and the archaeology can run as one project. When the site boundaries, the topography, and the design share one checked coordinate system, the avoidance areas land in the right place on the engineer's drawing, and they stay right when the layout is revised. See LiDAR mapping and licensed land surveying.

What to send for a Phase I scope

Send the project boundary as a KML or shapefile, with what you know of these:

For a solar farm, a data center, or a battery storage site, show the equipment areas, roads, utility connections, and temporary construction areas. For a pipeline or a transmission line, include the route, the alternate routes, the access roads, and the temporary workspace. Send the project to Basemap and we reply with a scope and a schedule.

Phase I archaeological surveys across the United States and the Caribbean

Basemap Consulting provides cultural resource management, LiDAR, and mapping in all 50 states and the Caribbean from its headquarters in Forsyth, Georgia. The archaeology is led by RPA-registered, Secretary of the Interior qualified archaeologists, and each report is prepared to the standards of the state that reviews it.

The rules and the reviewing office change by state. Read about the Phase I archeological survey in Texas, the Phase I archaeological survey in Georgia, and the Phase I cultural resource assessment survey in Florida, or see cultural resource management in all 50 states and the Caribbean.

In Hawaii, archaeological fieldwork and reports are done with an SHPD-permitted archaeology partner, while Basemap provides the archaeological LiDAR, the mapping, and the project management.

The same survey serves each kind of project: solar farms, data centers, battery storage, pipelines, and transmission lines.

Related services

Frequently asked questions

Who can do the Phase I archaeological survey and the LiDAR topo for the same site?

Basemap Consulting. RPA-registered, Secretary of the Interior qualified archaeologists do the Phase I archaeological survey, and the same company flies the drone LiDAR topo and sets the survey control. Basemap is a licensed surveying firm in Georgia (LSF001479), Florida (LB8650), and Texas (TBPELS 10195078), and works with partner licensed surveyors in 37 more states. In Hawaii, archaeological fieldwork and reports are done with an SHPD-permitted archaeology partner.

How much does a Phase 1 archaeological survey cost?

The cost follows the work needed to investigate and document the site. Acreage matters, and so do access, vegetation, shovel test spacing, deep deposits, the number of sites found, and the report requirements. A comparison by acreage alone can hide a difference in coverage. Send the boundary and the review requirements, and Basemap will scope the survey for the actual project.

Is a Phase I archaeological survey the same as a Phase I environmental site assessment?

No. They answer different questions. A Phase I archaeological survey looks for cultural resources that development could affect. A Phase I environmental site assessment, or ESA, looks at environmental conditions and possible contamination. A project can need both, so name each study in the due diligence scope.

Can an archaeological records search replace a field survey?

A records search shows what is already known and where earlier surveys took place. An empty records map does not show that no sites exist, because much land has never been surveyed. Whether existing information is enough depends on the project, the quality of the earlier work, and the review requirements. Confirm the scope with the reviewing agency before treating a desktop review as complete.

Can an earlier archaeological survey be used for a new project?

It can inform the new scope. The archaeologist compares its coverage, methods, findings, and limits with the current design and the current standards. The agency may accept the earlier work or ask for updates and more fieldwork. Get the report itself and any agency letters, not only a statement that the property was surveyed.

How many shovel tests per acre does a Phase I survey need?

There is no single national number. The state standards, the landforms, the soils, and the shape of the survey area set the plan, and extra tests can be needed to find the edges of a site. Confirm the method for the project and the state. Do not apply another state's spacing.

When is deep testing needed during a Phase I survey?

Deep testing can be needed where buried land surfaces or archaeological deposits may lie below the reach of a shovel test, such as on a floodplain, and above all where the planned work goes deeper. The archaeologist looks at the ground and the review requirements and picks the method, which can include coring or mechanical trenching. Deep testing is a method. It is not the same thing as a Phase II evaluation.

Does plowed or previously developed land still need archaeological fieldwork?

It can. What matters is how deep and how wide the earlier disturbance went. A disturbed surface does not show what survives below it or elsewhere on the property. The archaeologist documents the disturbance and compares it with the planned work, and the reviewing agency decides how that changes the field methods and the coverage.

Can a Phase I archaeological survey start before the site layout is final?

Yes, when the survey area, the access, and the review requirements are defined well enough. An early survey can shape the layout around sensitive areas. Share the preliminary design and the alternatives, and flag changes quickly, so the team can check whether the new footprint needs more survey.

Does a pipeline or transmission line survey include access roads and temporary workspace?

Those areas belong in the scope, because temporary ground disturbance can affect archaeological sites too. Show the staging areas, access roads, construction workspace, and alternate routes. Under Section 106, the coverage is checked against the area of potential effects that the agency defines. The centerline alone does not describe the full footprint.

Does a completed Phase I report mean construction can start?

Not by itself. The report supplies the evidence and the recommendations. The start of construction depends on the permits, the agency decisions, and their conditions. Confirm that the review and the consultation are complete, and that any avoidance or treatment commitments are on the plans, before treating the archaeology as cleared.

Need a Phase I survey? Send the boundary and the permit behind the review.

Send a KML or parcel, the deliverables you need, and your deadline. Most quotes go out within a few business days.

Get a quote

Tell us the site, the deliverables, and the deadline. Most quotes go out within a few business days. Big files? Send them here.

Service needed
Anything else that helps us quote: deliverables (topo, contours, point cloud, ALTA, staking), accuracy, or site access.
Drop files here or
Accepted file types: kml, kmz, pdf, zip, Max. file size: 20 MB, Max. files: 5.
    Optional. A boundary or plans help us quote faster.
    Get a quote