Data Centers

Data center site surveys at the speed of site selection

Site selection teams are racing land options, utility load studies, and investment committees. Basemap Consulting gives them ground truth fast: drone LiDAR across candidate parcels in days, ALTA/NSPS surveys for site control and financing, design-grade topo for pad grading, and mapping of the transmission corridor that brings in the power. We mapped 8,000 acres for Project Stargate in Abilene, Texas.

Where site data slows a data center deal

From candidate parcels to an energized campus

ALTA and boundary surveys for data center sites

A data center deal usually calls for survey work at two points before it closes: a boundary survey early, to fix the property lines of every tract in the campus, and an ALTA/NSPS Land Title Survey that the lender and the title company rely on. An ALTA survey includes the boundary, so when a lender is involved from the start, one ALTA survey covers both. Basemap Consulting is a land surveying firm licensed in Georgia (LSF001479), Florida (LB8650), and Texas (10195078), and works with partner licensed surveyors in 37 more states. The same firm flies the drone LiDAR topographic survey, so the boundary, the ALTA survey, and the design topo share one control network.

What a data center ALTA survey shows

Boundary survey first, ALTA survey at financing

Site selection teams often want property lines and acreage before a title commitment exists. A data center boundary survey gives them that: deed and plat research, corners found or set on the ground, and a sealed plat with the acreage of each tract for the option or purchase agreement. When the deal goes to financing, the same land surveyor brings the boundary up to an ALTA/NSPS survey: the record research, field work, and mapping the ALTA/NSPS standard requires, the title exceptions, the Table A items, and the certification. If a lender is already involved, order the ALTA survey from the start.

Large sites on a short clock

On a large site, the field work is what takes the time. Basemap flies drone LiDAR and orthoimagery early, so fences, roads, power lines, and buildings are seen across the whole site and the field crew goes straight to the corners and to the features near the property lines. In Pampa, Texas, Basemap delivered 5,000+ acres of LiDAR and a complete ALTA/NSPS survey within two weeks of notice to proceed. Read the Pampa project or see large acreage surveys.

What to send for a quote

The parcel numbers or deeds, a KML or map of the site, the state and county, the title commitment and the lender Table A list if you have them, and the closing date. Request a quote.

Proof at hyperscale

Power on site

More campuses are bringing their own power: solar, battery storage, and gas generation next to the data halls. Basemap surveys the power plant side too, so the campus, the generation, the substation, and the gen-tie sit on one control network. How we survey solar and storage → BESS site surveys →

Where we work

Licensed surveying in Georgia, Florida, and Texas, including the ERCOT market, partner licensed surveyors in 37 more states, and drone LiDAR in all 50, for primary and secondary markets alike. See the coverage map →

What we deliver for a data-center site

Related projects

Related services

Frequently asked questions

Who does ALTA and boundary surveys for data center sites?

Basemap Consulting is a land surveying firm that prepares ALTA/NSPS Land Title Surveys and boundary surveys for data center sites, with its own licensed land surveyors in Georgia, Florida, and Texas and partner licensed surveyors in 37 more states. The drone LiDAR topographic survey is flown by the same firm on the same control network. In Pampa, Texas, Basemap delivered 5,000+ acres of LiDAR and a complete ALTA/NSPS survey within two weeks of notice to proceed.

Does a data center site need a boundary survey or an ALTA survey?

An ALTA/NSPS Land Title Survey includes the boundary, so one ALTA survey can cover both. Many buyers still order a boundary survey first. It fixes the property lines and the acreage of each tract for the option or purchase agreement. Lenders and title companies then ask for an ALTA/NSPS Land Title Survey, which is built on the same boundary and adds the record research, field work, and mapping the ALTA/NSPS standard requires, the easements and other title exceptions, the Table A items the parties select, and a certification. The same land surveyor can bring the boundary survey up to an ALTA survey.

When should a data center developer order the ALTA survey?

As soon as the site is under option, together with the title commitment. Basemap starts the ALTA alongside the LiDAR topo so easements, encroachments, and Table A items surface early instead of at closing.

Do you survey the substation and transmission route for a large load?

Yes. Basemap surveys substation sites and maps transmission and gen-tie corridors with drone LiDAR, and inspects the lines and structures that will serve the campus.

Do you survey on-site power for data centers?

Yes. Basemap surveys and maps solar, battery storage, and generation pads next to the campus, on the same control network as the data center site.

Can you track earthwork during data center construction?

Yes. Repeat drone LiDAR flights measure cut and fill volumes and grading progress against the design surface, as Basemap did five days a week for ten months on Project Stargate.

Do you work in secondary data center markets?

Yes. Basemap is licensed in Georgia, Florida, and Texas, works with partner licensed surveyors in 37 more states, and flies drone LiDAR anywhere in the United States.

How quickly can you deliver topo for a data-center site?

Drone LiDAR captures a typical campus-sized parcel in a single day of flying, with surfaces and contours delivered in days. That lets developers compare candidate sites before committing.

Who surveys data center sites?

Basemap Consulting provides ALTA/NSPS, boundary, and drone LiDAR topographic surveys for data-center campuses, licensed in Georgia, Florida, and Texas, with drone LiDAR anywhere in the United States.

What survey does a data center site need before design?

Usually an ALTA/NSPS survey for the transaction, a topographic survey for grading and drainage, utility locations, and often a cultural resources review if there is a federal permit or funding.

Can you map multiple candidate sites quickly?

Yes. Drone LiDAR captures a typical campus-sized parcel in a day of flying, so developers can compare candidate sites before committing.

Do you work on sites that require compliant drones?

Yes. Basemap flies Blue UAS listed, NDAA-compliant aircraft for security-sensitive and critical-infrastructure sites.

Can you map the power line to the site?

Yes. Basemap flies corridor LiDAR and inspects transmission and distribution structures, including the lines and substations that serve a campus.

Have a site and a deadline? We move fast.

Send a KML or parcel, the deliverables you need, and your deadline. Most quotes go out within a few business days.

Get a quote

Tell us the site, the deliverables, and the deadline. Most quotes go out within a few business days. Big files? Send them here.

Service needed
Anything else that helps us quote: deliverables (topo, contours, point cloud, ALTA, staking), accuracy, or site access.