- 8,000
- acres mapped
- 5
- days a week
- 10
- months
- 0.1 ft
- survey grade
The challenge
A hyperscale AI campus moves faster than conventional survey can keep up with. The project team needed current, survey-grade ground truth across 8,000 acres, not once, but continuously, so earthwork, utilities, and construction progress could be tracked against design week after week.
What Basemap did
- Captured the full 8,000-acre site on a five-day-a-week cadence for ten months
- Held survey-grade accuracy on every delivery, tied to a consistent control network
- Turned each capture into current surfaces, orthomosaics, and progress data the project team could act on
- Scaled crews and processing to keep pace with a construction schedule that never slowed down
Why it matters
Speed and skill at this scale is rare. Plenty of firms can fly a site once. Very few can deliver survey-grade data across thousands of acres, every week, for most of a year, without the quality slipping.
Header image: Basemap point cloud of the Project Stargate site.