Renewables

Solar, wind, and storage surveying that keeps you on schedule to COD

Development teams are measured on megawatts to COD, and the survey sits on the critical path at every gate: site control, diligence, financing, and construction. Basemap Consulting flies thousands of acres of drone LiDAR topo in days, delivers ALTA/NSPS surveys that lenders accept, clears cultural resources early, and stakes ahead of the pile rigs, all on one control network from the first flight to the last pile.

Where survey delays cost solar developers

One survey partner from site control to COD

ALTA surveys for solar farms

An ALTA/NSPS Land Title Survey is the survey that the lender, the tax equity investor, and the title company rely on before a solar project closes. It shows the boundary of every parcel, the easements and other exceptions listed in the title commitment, access to a public road, and what is built on the land. Basemap Consulting prepares ALTA surveys for solar farms with its own licensed surveyors in Georgia, Florida, and Texas, and with partner licensed surveyors in 37 more states.

What makes a solar farm ALTA survey different

How LiDAR shortens the ALTA schedule

On a large site the boundary crew and the drone work at the same time. Licensed surveyors research the deeds and find and tie the boundary monuments on the ground. LiDAR and orthoimagery on the same control network locate fences, roads, buildings, power lines, ponds, and other features across the interior of the site. Features near the boundary, easement, and setback lines are located on the ground by the survey crew. The topographic survey for the civil design comes from the same flight. In Pampa, Texas, Basemap delivered more than 5,000 acres of LiDAR and a complete ALTA/NSPS survey within two weeks of notice to proceed. Read about the Pampa project →

What to send for a quote

We update and recertify the survey as parcels are added or dropped. See also large-acreage surveys and licensed land surveying.

Boundary surveys for solar farms

A boundary survey shows where the property lines of each tract are on the ground. On a solar farm everything else is measured from those lines: the fence, the setbacks the county requires, the acres in each lease, and the ALTA survey the lender asks for later. Basemap Consulting prepares boundary surveys for solar farms with its own licensed land surveyors in Georgia, Florida, and Texas, and with partner licensed surveyors in 37 more states.

What a solar farm boundary survey includes

Boundary survey or ALTA survey?

A boundary survey establishes the property lines. An ALTA/NSPS Land Title Survey starts from the same boundary and adds the easements and other exceptions from the title commitment, the Table A items, and a certification to the lender and the title company. Many developers order the boundary survey early, for site control and layout, and have the same surveyor bring it up to an ALTA survey when the project goes to financing. If you already know a lender will ask for an ALTA survey, order it from the start. Send us the lender requirements and we will quote to that list.

Where drone LiDAR helps a boundary survey

Property corners are established on the ground by licensed surveyors, from the deeds and the monuments they find. The drone adds the picture around those lines. LiDAR and orthoimagery flown on the same control network show fences, tree lines, farm roads, and buildings along miles of boundary, so the crew knows where to look first, and anything that appears to cross a line is then measured on the ground. The topographic survey for the civil design comes from the same flight.

What to send for a boundary survey quote

The tax parcel numbers or deeds for each tract, a KML or map of the project, the state and county, the title commitment if you have one, and the deadline. Request a quote.

Topographic surveys for solar farms

A solar farm topographic survey is the map of the ground that the civil engineer uses to lay out the arrays, design the grading and drainage, and, together with the geotechnical report, set pile lengths. On a site of hundreds or thousands of acres, Basemap Consulting flies the topographic survey with drone LiDAR and ties it to ground control set by its own survey crews. Sealed topographic surveys are signed by our licensed surveyors in Georgia, Florida, and Texas, and by partner licensed surveyors in 37 more states.

What a solar farm topographic survey shows

Drone LiDAR or a ground crew

A ground crew needs weeks to walk a 3,000-acre site, and in thick brush it can only shoot where it can reach. A drone LiDAR flight covers the whole site in days, open ground and brush alike. Basemap has flown 8,000 acres of LiDAR in a single day and 16,000 acres in four days in the Permian Basin. The ground crew still does its part: it sets the control, shoots independent checkpoints, and the LiDAR surface is checked against those checkpoints before it is delivered.

One surface from site screening to as-built

A flight planned to design specifications can serve every stage of the project. It screens slope and buildable acres before the land is signed, it is the topographic survey for layout and grading design, it locates interior features for the ALTA survey, and it is the pre-construction surface that staking and as-builts are measured against. Everything stays on one control network. See drone LiDAR mapping for how the data is captured and processed.

What to send for a topographic survey quote

Cultural resources and archaeological surveys for solar farms

A cultural resources survey finds out whether a solar site holds archaeological sites, cemeteries, or historic structures while the layout can still move. Basemap Consulting is a cultural resource management firm as well as a surveying and LiDAR company. Its RPA-registered, Secretary of the Interior qualified archaeologists survey solar, wind, and battery storage sites across the United States, and the same company flies the LiDAR topo, so the archaeology and the civil design start from one basemap. The steps, the schedule, and what to send are on the Phase I archaeological survey page. In Hawaii, archaeological fieldwork and reports are done with an SHPD-permitted archaeology partner, and Basemap provides the archaeological LiDAR, mapping, and project management.

When a solar project needs an archaeological survey

What a Phase I archaeological survey of a solar site includes

  1. Background research. We look up the known sites and earlier surveys in the state site file and read historic maps and aerial photos of the land.
  2. LiDAR review. Our archaeologists read the bare-earth model from the topo flight for mounds, earthworks, cemeteries, old roadbeds, and foundations under the trees.
  3. Field survey. The crew walks the site and tests below the surface, usually with shovel tests, to the standards of the State Historic Preservation Office that will review the report.
  4. Report and site forms. The report records each site and recommends what to do about it: avoid it, or evaluate it further with a Phase II investigation.
  5. Avoidance boundaries. Each site that needs protection is delivered as a GIS and CAD boundary on the same coordinates as the topo, so the engineer can move arrays, roads, and trenches around it.

Why the LiDAR and the archaeology should come from one company

Solar sites cover a lot of ground, and the archaeologists need a map of all of it before the crew goes out. Basemap maps large sites fast (16,000 acres of LiDAR in the Permian Basin in four days, flown for pads, roads, and pipeline routes), so on a solar site the bare-earth model can be ready when the fieldwork is planned. LiDAR does not replace the field survey and it does not see anything buried. It shows the crew where to look first. Because the topo and the archaeology share one control network, the avoidance boundaries drop straight into the design. More on the method: archaeological LiDAR surveys.

When to start

Start the cultural resources survey with the LiDAR topo, during diligence. The schedule has to cover the fieldwork, the report, and agency review. Agency review takes time the developer does not control: under the Section 106 rules in 36 CFR Part 800, the State Historic Preservation Office generally has 30 days to review a finding once it has received complete documentation, and consultation or a request for more information can add to that. A survey that starts early leaves room to move the layout and still reach notice to proceed on schedule.

What to send for a quote

The project boundary (KML or shapefile), the state and county, the permit or agency that is driving the review if you know it, and your schedule. We confirm the review agency and its survey standards and send a scope. State by state details are on the cultural resource management in all 50 states page. Request a quote.

Proof at utility scale

Wind farms

Wind projects spread across dozens of landowners and miles of collection lines. Basemap delivers boundary and ALTA surveys across the lease block, drone LiDAR topo for turbine pads, crane paths, and access roads, collection line and gen-tie corridors, staking of turbine centers, pads, and roads, and as-builts, all on one control network.

Battery storage (BESS)

Standalone and co-located battery storage moves fast and sits on tight sites. Basemap provides ALTA and topographic surveys for the BESS yard, drainage and grading surfaces from LiDAR, staking of container pads, foundations, and fence lines, and surveys of the substation and point of interconnection. What a BESS site survey includes →

Solar, storage, and data centers on one site

More developers are putting generation, battery storage, and a data center on the same land. Basemap has mapped both sides: utility-scale solar and the 8,000-acre Project Stargate campus. One survey team and one control network across the solar field, BESS yard, substation, gen-tie, and campus keeps the whole site in one coordinate system and one schedule.

For civil and engineering firms

Short on survey crews this season? Basemap works as the survey and LiDAR arm for engineering firms on renewable projects: drone LiDAR topo in your coordinate system and CAD standards, licensed surveying in Georgia, Florida, and Texas, and partner surveyors in 37 more states. How we work with engineering firms →

Where we work

Licensed in Georgia, Florida, and Texas, with partner licensed surveyors in 37 more states and drone LiDAR in all 50. See the coverage map →

Solar staking that keeps the pile drivers moving

Solar surveying and staking in Georgia

Basemap is headquartered in Forsyth, Georgia (firm license LSF001479). Recent Georgia work includes 5,000 acres of ALTA and topographic survey with drone LiDAR under pine forest, and crews staking piles and rows through swamps, pine woods, and clearing limits. Georgia surveying and LiDAR →

Solar surveying and staking in Florida

Basemap holds Florida license LB8650, with a party chief in Fort Myers who has staked a 4,000-acre solar farm and drafted 8,000- and 16,000-acre sites. Recent Florida work includes 2,000 acres of ALTA and topographic survey with drone LiDAR in Central Florida. Florida surveying and LiDAR →

Solar surveying and staking in Texas

Basemap holds Texas firm registration 10195078. In Pampa, Texas, Basemap delivered 5,000+ acres of drone LiDAR and a complete ALTA/NSPS survey within two weeks of notice to proceed for a solar development, and flew 16,000 acres of LiDAR and photogrammetry in four days in the Permian Basin. Texas surveying and LiDAR →

Topography under brush and pine

Most solar sites in the Southeast are wooded or overgrown. Drone LiDAR reaches the ground through gaps in the canopy, so design topography does not wait on clearing. Recent work includes 5,000 acres in Georgia and 2,000 acres in Central Florida.

Interconnection and transmission

Projects live or die on interconnection. Basemap maps and inspects the transmission lines and substations that connect a project, with corridor LiDAR and structure-by-structure imagery. See transmission line LiDAR surveys and gen-tie route surveys.

Related projects

Related services

Frequently asked questions

Who surveys wind farms?

Basemap Consulting surveys wind projects: boundary and ALTA surveys across the lease block, drone LiDAR topo for turbine pads, crane paths, and roads, collection line corridors, and staking and as-builts. Licensed in Georgia, Florida, and Texas, with partner surveyors in 37 more states and LiDAR in all 50.

Who surveys battery storage (BESS) sites?

Basemap Consulting provides ALTA and topographic surveys, LiDAR grading surfaces, and pad and foundation staking for standalone and co-located battery storage, plus substation and interconnection surveys.

Who does ALTA surveys for solar farms?

Basemap Consulting prepares ALTA/NSPS Land Title Surveys for utility-scale solar farms, with its own licensed surveyors in Georgia, Florida, and Texas and partner licensed surveyors in 37 more states. The boundary crew and the drone LiDAR work at the same time, so the ALTA survey and the topographic survey arrive together. In Pampa, Texas, Basemap delivered 5,000+ acres of LiDAR and a complete ALTA/NSPS survey within two weeks of notice to proceed.

What does an ALTA survey for a solar farm include?

The boundary of every parcel, the easements and other plottable exceptions from the title commitment, access to a public road, visible improvements and utilities, and the Table A items the lender asks for, such as flood zone, gross land area, and adjoining owners. On a solar site it also covers the leased tracts and the collection line, access, and gen-tie easements.

How long does an ALTA survey take for a large solar site?

It depends on the acreage, the number of parcels, and how many exceptions are in the title commitment. Flying the site with LiDAR while the boundary crew works keeps the schedule short. Basemap delivered 5,000+ acres of LiDAR and a complete ALTA/NSPS survey in Pampa, Texas within two weeks of notice to proceed. Send the title commitment with the request so title items do not hold up the closing.

Who does boundary surveys for solar farms?

Basemap Consulting prepares boundary surveys for utility-scale solar farms with its own licensed land surveyors in Georgia, Florida, and Texas, and with partner licensed surveyors in 37 more states. The survey covers deed research, corners found or set on the ground, the acreage of each tract, and a signed and sealed plat, and the drone LiDAR topographic survey can be flown at the same time on the same control network.

Is a boundary survey enough for a solar farm, or do I need an ALTA survey?

A boundary survey is enough to establish the property lines for site control, lease exhibits, and early layout. Lenders, tax equity investors, and title companies usually ask for an ALTA/NSPS Land Title Survey before the project closes. The ALTA survey starts from the same boundary, so the same surveyor can bring a boundary survey up to an ALTA survey when the project goes to financing.

Who does topographic surveys for solar farms?

Basemap Consulting flies topographic surveys for utility-scale solar farms with drone LiDAR, tied to ground control set by its own survey crews. Sealed topographic surveys come from its licensed surveyors in Georgia, Florida, and Texas and from partner licensed surveyors in 37 more states, and the LiDAR is flown in all 50 states. Basemap has flown 8,000 acres of LiDAR in a single day and delivered 5,000+ acres of LiDAR plus a complete ALTA/NSPS survey in Pampa, Texas within two weeks of notice to proceed.

What does a topographic survey for a solar farm include?

A bare-earth ground surface under brush and trees, one-foot contours and spot elevations, a Civil 3D surface for layout and grading, a slope map, drainage features such as flow paths, ditches, and culverts, the fences, roads, buildings, and power lines already on the land, and ground shots on pavement, culverts, and tie-in points.

Should a solar farm topographic survey be flown with drone LiDAR or done by a ground crew?

On a large site, both together. Drone LiDAR covers thousands of acres in days, including brushy ground where a ground crew would need weeks. The ground crew sets the control, shoots independent checkpoints to check the LiDAR surface, and measures the points the design depends on, such as culverts, pavement, and tie-in points.

Who does cultural resources surveys for solar projects?

Basemap Consulting. Its RPA-registered, Secretary of the Interior qualified archaeologists handle Section 106 and NEPA compliance and Phase I to III archaeological surveys for solar, wind, and battery storage projects across the United States, and the same company flies the drone LiDAR topo and prepares the ALTA and boundary surveys. In Hawaii, archaeological fieldwork and reports are done with an SHPD-permitted archaeology partner, and Basemap provides the archaeological LiDAR, mapping, and project management.

What is a Phase I archaeological survey for a solar farm?

It is the first field survey for cultural resources: background research in the state site file, a review of the bare-earth LiDAR, a walk over the site, usually with shovel tests, and a report with site forms for the agency and the State Historic Preservation Office. Sites that need protection are delivered as avoidance boundaries in GIS and CAD on the same coordinates as the topographic survey.

When should the cultural resources survey for a solar project start?

During diligence, at the same time as the LiDAR topo. The schedule has to cover the fieldwork, the report, and agency review. Under the Section 106 rules, the State Historic Preservation Office generally has 30 days to review a finding once it has received complete documentation, so a survey that starts early leaves room to move the layout before notice to proceed.

When should a solar developer order the ALTA survey?

As soon as the land is under option, together with the title commitment. The ALTA is often what holds up financing, so Basemap starts it alongside the LiDAR topo and updates it as parcels are added or dropped.

Can you survey a solar site before the land deal is final?

Yes. LiDAR across candidate parcels screens slope, drainage, and buildable acres before you commit, and the same data carries into design once the site is secured.

Do you survey battery storage, substations, and gen-tie lines?

Yes. Basemap surveys BESS yards, collector and point-of-interconnection substations, and gen-tie corridors, and flies corridor LiDAR and drone inspection for transmission lines.

Do you work on sites that pair solar with a data center?

Yes. Basemap has mapped utility-scale solar sites and the 8,000-acre Project Stargate campus in Abilene, Texas, and can carry one control network across the solar field, storage, substation, and data center.

Can Basemap add survey capacity for an engineering firm?

Yes. Basemap works as the survey and LiDAR arm for civil and engineering firms on renewable projects, delivering in the firm's coordinate system and CAD standards, with licensed surveying in Georgia, Florida, and Texas and partner surveyors in 37 more states.

What survey data does a utility-scale solar project need?

Most projects need a boundary and ALTA survey, a LiDAR topographic survey for grading and pile design, construction staking, an as-built check, and a cultural resources survey when there is a federal nexus.

How long does LiDAR topo take for a large solar site?

Field capture for a site of several thousand acres typically takes days, not weeks, and processed surfaces follow shortly after. Exact timing depends on acreage, vegetation, and the deliverables required.

Who does solar construction staking in Georgia?

Basemap Consulting, headquartered in Forsyth, Georgia (license LSF001479), stakes piles, tracker rows, roads, fences, and pads for utility-scale solar statewide, on the same control as the ALTA and LiDAR topo.

Who does solar construction staking in Florida?

Basemap Consulting (Florida license LB8650) stakes utility-scale solar in Florida, with a Fort Myers party chief who has staked a 4,000-acre solar farm.

Who does solar construction staking in Texas?

Basemap Consulting (Texas firm registration 10195078) provides solar construction staking, ALTA/NSPS, and drone LiDAR topo across Texas, including 5,000+ acres plus an ALTA in two weeks in Pampa.

Who surveys solar farms?

Basemap Consulting surveys utility-scale solar farms: ALTA/NSPS and boundary surveys, drone LiDAR topography, construction staking, and as-builts in Georgia, Florida, and Texas, with LiDAR and cultural resources anywhere in the US.

Can drone LiDAR replace a ground topo survey for a solar farm?

For large solar sites, yes in most cases. Drone LiDAR captures thousands of acres in days and reaches bare earth under brush and tree lines, checked against surveyed ground control at about 0.1 ft.

Who does construction staking for solar farms?

Basemap Consulting provides licensed construction staking for utility-scale solar in Georgia, Florida, and Texas: piles, tracker rows, roads, fences, pads, and as-built checks.

How fast can you survey a large solar site?

Basemap delivered 5,000+ acres of LiDAR and an ALTA survey within two weeks of notice to proceed in Pampa, Texas.

Do solar projects need a cultural resources survey?

Often. A federal permit such as a U.S. Army Corps of Engineers Section 404 permit, federal funding or a federal loan, or federal land puts the project into Section 106 review, and some state laws and county permits ask for a survey too. Basemap provides Section 106 and NEPA cultural resource surveys alongside the LiDAR topo, the ALTA survey, and the staking.

Can you survey solar sites outside Georgia, Florida, and Texas?

Yes. Basemap flies LiDAR topography and as-built LiDAR for solar sites anywhere in the US, surveys and stakes with its own licenses in Georgia, Florida, and Texas, and works with partner licensed surveyors in most other states.

Have a site and a deadline? We move fast.

Send a KML or parcel, the deliverables you need, and your deadline. Most quotes go out within a few business days.

Get a quote

Tell us the site, the deliverables, and the deadline. Most quotes go out within a few business days. Big files? Send them here.

Service needed
Anything else that helps us quote: deliverables (topo, contours, point cloud, ALTA, staking), accuracy, or site access.
Drop files here or
Accepted file types: kml, kmz, pdf, zip, Max. file size: 20 MB, Max. files: 5.
    Optional. A boundary or plans help us quote faster.
    Get a quote