Oil & Gas

Oil and gas surveying on your drilling schedule

Landmen and project teams can't let the survey hold up a permit, a lease deal, or a right-of-way. Basemap Consulting turns oil and gas surveys around fast with whatever fits the job: drone LiDAR for pads and leases, manned aircraft LiDAR for long pipeline routes and whole prospects, ground crews for staking and plats, and laser scanning for facilities. We captured 16,000 acres of survey-grade LiDAR in four days in the Permian Basin.

What landmen need from a survey firm

Every capture method, one team

Fast turnaround, proven at scale

Pipeline route surveys and right-of-way

Pipeline route surveys, step by step

A pipeline route survey takes a line from a first idea on a map to a recorded easement and a built, documented pipe. Basemap does the survey work at each step with its own LiDAR aircraft, ground crews, and drafters, alongside your engineers and land team, so the route, the exhibits, and the as-built all sit on the same survey control.

  1. Route study. We fly LiDAR and imagery over the whole corridor, wide enough to cover the alternatives. The bare-earth surface shows slopes, draws, drainage, and brush, and the imagery shows the pads, lease roads, fences, and power lines already on the ground.
  2. Route selection. Engineers and landmen compare alternatives in the office on current data. A reroute around a landowner, a wetland, or a cultural site that stays inside the corridor we flew is redrawn from the same LiDAR, usually with no new flight.
  3. Tract and landowner maps. GIS maps show each tract the route crosses, so the land team knows who to see and how much of each tract is affected.
  4. Centerline and workspace survey. Ground crews set control, stake the centerline and workspace, and survey the crossings of roads, railroads, and water.
  5. Easement exhibits. Each tract gets an easement exhibit and a legal description, ready for the landowner meeting and for recording.
  6. Construction and as-built. Staking for construction, then an as-built survey of the pipe with depth-of-cover records.
  7. After it is built. Drone patrols of the right-of-way show encroachments and erosion, with dated imagery for restoration and surface damage settlements.

Where a route crosses federal land or needs a federal permit, our archaeologists run the cultural resource survey on the same schedule.

Pipeline route surveys in the Permian Basin

Basemap is a Texas-registered surveying firm (10195078) and has captured 16,000 acres of survey-grade LiDAR and photogrammetry in four days in the Permian Basin, for pads, roads, ponds, and pipeline routes. The Permian is crowded with existing pads, lease roads, flowlines, and power lines, and it changes month to month, so a route planned on old maps runs into things that are not on them. Current LiDAR and imagery fix that before the centerline is staked. For long lines, gathering systems, and whole prospects we fly manned aircraft LiDAR; for shorter routes and tie-ins we fly drone LiDAR. The same crews have flown 648 miles of corridor LiDAR along Texas transmission and distribution lines. Deliverables are set to the Texas State Plane zone the project uses, Central or North Central across most of the basin, or to your project grid.

Where we work

Licensed surveying in Texas (firm registration 10195078), including the Permian Basin and Midland, plus Georgia and Florida. Partner licensed surveyors cover most other producing states, and drone and manned LiDAR fly anywhere in the United States. Texas work →

Related projects

Related services

Frequently asked questions

Who does oil and gas surveying in the Permian Basin?

Basemap Consulting, a Texas-registered surveying firm (10195078). Basemap captured 16,000 acres of survey-grade LiDAR and photogrammetry in four days in the Permian Basin for pads, roads, ponds, and pipeline routes.

Can you turn around a well location plat fast?

Yes. Tell us the permit deadline and spud date. Basemap schedules plats and well staking around the drilling schedule, with licensed surveying in Texas and partner surveyors in most other producing states.

Who does pipeline route surveys?

Basemap Consulting does pipeline route surveys with its own LiDAR aircraft, ground crews, and drafters: corridor LiDAR for route selection, centerline, workspace, and crossing surveys, easement exhibits and legal descriptions for every tract, construction staking, and as-built surveys. Basemap is licensed for surveying in Texas, Georgia, and Florida, works with partner licensed surveyors in 37 more states, and flies LiDAR in all 50 states.

What does a pipeline route survey include?

A route study from corridor LiDAR and imagery, route selection and alternatives, tract and landowner maps, a centerline and workspace survey with road, railroad, and water crossings, an easement exhibit and legal description for each tract, construction staking, and an as-built survey with depth-of-cover records.

Who does pipeline route surveys in the Permian Basin?

Basemap Consulting, a Texas-registered surveying firm (10195078). Basemap captured 16,000 acres of survey-grade LiDAR and photogrammetry in four days in the Permian Basin for pads, roads, ponds, and pipeline routes, and flies manned aircraft LiDAR for long lines and drone LiDAR for shorter routes and tie-ins.

Do you prepare easement exhibits for pipeline right-of-way?

Yes. Basemap prepares easement exhibits and legal descriptions for every tract on a route, so landmen can take them straight to the landowner.

Can LiDAR replace a ground survey for a pipeline route?

For route selection and design, largely yes: LiDAR maps terrain, drainage, and vegetation along the whole corridor at once, so a reroute that stays inside the corridor we flew usually needs no new flight. Centerline staking and as-builts are done on the ground, and Basemap does both.

Do you fly manned aircraft LiDAR?

Yes. Basemap uses manned aircraft LiDAR for long pipeline routes, gathering systems, and prospect-scale areas, and drone LiDAR for pads, leases, and shorter routes.

Do you laser scan oil and gas facilities?

Yes. Basemap provides terrestrial laser scanning of tank batteries, compressor stations, and plants for as-built models and tie-ins.

Can you document surface damage before and after construction?

Yes. Dated drone imagery and LiDAR of pads, roads, and routes before and after construction support surface damage and restoration settlements.

How fast can Basemap start an oil and gas job?

Fast. Send the lease, route, or pad location and your deadline. Basemap has captured 16,000 acres in four days and 8,000 acres in a single day.

Have a site and a deadline? We move fast.

Send a KML or parcel, the deliverables you need, and your deadline. Most quotes go out within a few business days.

Get a quote

Tell us the site, the deliverables, and the deadline. Most quotes go out within a few business days. Big files? Send them here.

Service needed
Anything else that helps us quote: deliverables (topo, contours, point cloud, ALTA, staking), accuracy, or site access.
Drop files here or
Accepted file types: kml, kmz, pdf, zip, Max. file size: 20 MB, Max. files: 5.
    Optional. A boundary or plans help us quote faster.
    Get a quote