Why developers hire one CRM firm for every state
- One process, many states: the federal Section 106 process is the same nationwide, but each State Historic Preservation Office (SHPO) sets its own survey and report standards. We prepare reports and site forms to the standards of the state where the project is.
- Archaeology early, not last: archaeological LiDAR and GIS show where cultural resources are most likely, field crews test those areas first, and layouts move while the design is still flexible.
- Built for large sites: utility-scale solar, wind, battery storage, transmission, pipeline, and data-center projects often trigger Section 106 review. Basemap has flown 16,000 acres of LiDAR in four days, so the terrain data is ready when the archaeologists need it. See cultural resources surveys for solar farms.
- One contract: LiDAR topo, licensed surveying, and cultural resources from the same team. Basemap is a licensed surveying firm in Georgia, Florida, and Texas and works with partner licensed surveyors in 37 more states.
- Confidential: site locations are shared only with the project team and the agencies you designate.
For developers: what an archaeologist does on your development project
Most developers meet archaeology through a permit condition. Basemap works as the archaeologist for the development project: we help you find out whether a survey is required, do the Phase I archaeological survey, and give your engineers boundaries they can design around. This is what the work looks like from the project team side.
When a development project needs an archaeologist
- A federal permit, license, funding, or land. Any of these can put the project into Section 106 review when the work could affect historic properties. A U.S. Army Corps of Engineers Section 404 permit is a common trigger on private land.
- A state law. Examples are Chapter 267, Florida Statutes, the Antiquities Code of Texas on public land, HRS Chapter 6E in Hawaii, and the California Environmental Quality Act (CEQA).
- A county or city requirement. Some land development codes ask for a cultural resources survey as part of an approval.
- A cemetery or a recorded site on the tract. Old cemeteries, home sites, and recorded archaeological sites are easier to plan around when they are mapped before the layout is drawn.
- Diligence before closing. Some project teams order a records search or a survey before they buy the land, so the risk is known up front.
Phase I archaeological survey: the first step for most projects
A Phase I archaeological survey, also written Phase 1 or Phase one, finds out whether the project area holds archaeological sites. It has three parts. The full guide, with the schedule, the cost drivers, and what to send, is on the Phase I archaeological survey page.
- Background research. We check the state site file for recorded sites and earlier surveys, and read historic maps and aerial photos.
- Field survey. Archaeologists walk the project area and dig shovel tests at the spacing the state standards call for. Drone LiDAR flown before fieldwork shows the crew where to look first.
- Report. The report records each site that was found, recommends whether it needs more work, and is written to the standards of the State Historic Preservation Office that reviews it.
When the survey finds no sites that may be eligible for the National Register of Historic Places, the report recommends no further archaeological work, and the agency makes the finding for the project. Once the agency and the State Historic Preservation Office agree, the archaeology usually ends at Phase I, unless something is discovered later during construction.
The rules and the reviewing office change by state. See the Phase I archeological survey in Texas, the Phase I archaeological survey in Georgia, and the Phase I cultural resource assessment survey (CRAS) in Florida.
If the Phase I survey finds a site
- Avoid it. We deliver GIS avoidance boundaries and the layout moves away from the site. On a large site with room to shift, this is often the simplest answer.
- Evaluate it. A Phase II evaluation tests the site to see whether it may be eligible for the National Register of Historic Places.
- Mitigate. If an eligible site cannot be avoided, the agency and the consulting parties agree on what will be done, such as Phase III data recovery or archaeological monitoring during construction.
What to send for a Phase I archaeological survey quote
- The project boundary as a KML or shapefile, and the acreage
- The permit or agency driving the review, if you know it
- The ground cover and access: woods, pasture, row crops, or wetlands
- Your schedule, and any earlier survey or environmental report for the site
We reply with a scope and a schedule. Time in the field depends on the acreage, the ground cover, and the testing the state standards require. Basemap also flies the LiDAR topo, and provides the boundary or ALTA survey as a licensed surveying firm in Georgia, Florida, and Texas and with partner licensed surveyors in 37 more states, so one team covers the land survey and the archaeology. In Hawaii, archaeological fieldwork and reports are done with an SHPD-permitted archaeology partner, and Basemap provides the archaeological LiDAR, mapping, and project management.
Who reviews a cultural resources survey in each state
A federal permit, federal funding, or federal land puts a project into Section 106 review, and the State Historic Preservation Office or its territorial equivalent reviews the survey. Some states add their own laws. These are the review agencies in the places buyers ask us about most:
- Georgia: Historic Preservation Division of the Georgia Department of Community Affairs. Basemap is headquartered in Forsyth, Georgia.
- Florida: Florida Division of Historical Resources, which also keeps the Florida Master Site File.
- Texas: Texas Historical Commission. Work on public land in Texas also falls under the Antiquities Code of Texas.
- Hawaii: State Historic Preservation Division (SHPD), under HRS Chapter 6E as well as Section 106. In Hawaii, archaeological fieldwork and reports are done with an SHPD-permitted archaeology partner, and Basemap provides the archaeological LiDAR, mapping, and project management.
- California: California Office of Historic Preservation. Many projects are also reviewed for cultural resources under the California Environmental Quality Act (CEQA).
- Illinois: Illinois State Historic Preservation Office, part of the Illinois Department of Natural Resources.
- Indiana: Division of Historic Preservation and Archaeology of the Indiana Department of Natural Resources.
- Tennessee: Tennessee Historical Commission, which serves as the State Historic Preservation Office.
- North Carolina: North Carolina State Historic Preservation Office, with the Office of State Archaeology.
- Colorado: History Colorado, Office of Archaeology and Historic Preservation.
- Arizona: Arizona State Historic Preservation Office, part of Arizona State Parks and Trails.
- Puerto Rico: Puerto Rico State Historic Preservation Office. Federal projects go through Section 106 just as on the mainland.
- U.S. Virgin Islands: Virgin Islands State Historic Preservation Office, part of the Department of Planning and Natural Resources.
Projects on Tribal land, or that may affect places of importance to Tribes, also involve Tribal Historic Preservation Officers and Tribal consultation. Your project is in another state? The process is the same: send the location and we will confirm the review agency and its standards.
Cultural resource management in Georgia
Basemap is headquartered in Forsyth, Georgia, and its archaeology crews mobilize from there to any county in the state. Federal projects go through Section 106 review by the Historic Preservation Division (HPD) of the Georgia Department of Community Affairs, which serves as the State Historic Preservation Office.
- What triggers review: a U.S. Army Corps of Engineers Section 404 permit, federal funding or loans, a federal license, or federal land. State agency projects can be reviewed under the Georgia Environmental Policy Act.
- Records search: background research starts at the Georgia Archaeological Site File at the University of Georgia, where new sites are recorded and given state site numbers.
- Standards: fieldwork and reports follow the Georgia Standards and Guidelines for Archaeological Investigations, the standards HPD reviewers look for.
- Cemeteries: Georgia law (O.C.G.A. 36-72) requires a permit from the local government before an abandoned cemetery or burial ground is disturbed for development, and the application calls for an archaeologist's report and a survey by a registered surveyor. Basemap has archaeologists and Georgia licensed surveying (LSF001479) on one team, and LiDAR helps find unmarked cemeteries under pine before the design is locked.
Surveying, LiDAR, and cultural resources in Georgia →
Cultural resource management in Florida
In Florida the survey is usually called a cultural resource assessment survey (CRAS). The Division of Historical Resources (DHR) of the Florida Department of State serves as the State Historic Preservation Office and reviews it.
- What triggers review: a federal permit, federal funding, or federal land under Section 106, and state permits, state funding, or state land under Chapter 267, Florida Statutes. Many county and city land development codes ask for a survey too.
- Records search: background research starts at the Florida Master Site File. Each new site and each survey is recorded there with Site File forms and a survey log sheet.
- Standards: reports are written to Chapter 1A-46, Florida Administrative Code, which sets what a complete archaeological report must contain.
- Burials: unmarked human burials are protected by section 872.05, Florida Statutes, so a find stops work in that area, the authorities are notified, and work there resumes only when it is authorized.
- One team: Basemap is also a licensed surveying and mapping business in Florida (LB8650), so the boundary, the LiDAR topo, and the CRAS can come from one contract.
Surveying, LiDAR, and cultural resources in Florida →
Cultural resource management in Texas
The Texas Historical Commission (THC) serves as the State Historic Preservation Office and reviews Section 106 surveys in Texas. Texas also has its own law, the Antiquities Code of Texas, which covers public land.
- What triggers review: a U.S. Army Corps of Engineers Section 404 permit, federal funding, a federal license, or federal land under Section 106. Under the Antiquities Code, projects on land owned or controlled by the state or a political subdivision (a city, county, river authority, utility district, or school district) are reviewed by the THC as well.
- Antiquities Permits: archaeological fieldwork on public land is done under a Texas Antiquities Permit that the THC issues before the crew goes out.
- Records search: background research uses the Texas Archeological Sites Atlas. New sites are recorded with the Texas Archeological Research Laboratory at the University of Texas at Austin, which assigns the site numbers.
- Standards: survey methods follow the archeological survey standards used by the THC and the Council of Texas Archeologists, including deeper testing where floodplain soils can bury sites.
- Large sites: solar, wind, battery storage, transmission, and pipeline projects cover a lot of ground. Basemap flew 16,000 acres of LiDAR in the Permian Basin in four days, so archaeologists start with a bare-earth map of the whole site. Basemap is also a registered surveying firm in Texas (TBPELS 10195078).
Drone LiDAR, surveying, and cultural resources in Texas →
Cultural resource management in Hawaii
In Hawaii, cultural resources are reviewed by the State Historic Preservation Division (SHPD) of the Department of Land and Natural Resources. Hawaii has its own historic preservation law, Hawaii Revised Statutes (HRS) Chapter 6E, which reaches many private projects as well as public ones. On Hawaii projects, Basemap provides the archaeological LiDAR, mapping, and project management, and the archaeological fieldwork and reports are done with an SHPD-permitted archaeology partner.
- What triggers review: state and county projects are reviewed under HRS 6E-8. Private projects that need a state or county permit, such as grading, subdivision, or a land use change, are reviewed under HRS 6E-42. A federal permit, federal funding, or federal land adds Section 106, which in Hawaii includes consultation with Native Hawaiian organizations.
- The survey: the standard study is the archaeological inventory survey (AIS). It covers background research, a field survey of the project area, subsurface testing where it is needed, and a report that records each site and recommends how to treat it. The rules for the survey and the report are in Hawaii Administrative Rules Chapter 13-276. On our Hawaii projects the survey and report are done with an SHPD-permitted archaeology partner, and Basemap provides the archaeological LiDAR, mapping, and project management.
- Who does the fieldwork: archaeological fieldwork in Hawaii is done under a permit that SHPD issues to the archaeology firm, so our Hawaii fieldwork and reports are done with an SHPD-permitted archaeology partner.
- Burials: Native Hawaiian burial sites are protected under Chapter 6E, and the island burial councils decide whether previously identified Native Hawaiian burials are preserved in place or relocated. If remains are found during work, the work stops in that area and the find is reported to the authorities, including SHPD.
- What LiDAR adds: Basemap drone LiDAR filtered to bare earth shows stone walls, agricultural terraces, enclosures, platforms, and old trails under dense vegetation before a crew walks the ground, so the field survey is planned around what is there. Basemap mapped about 1,500 acres of Lahaina, Maui, with drone LiDAR and photogrammetry after the 2023 wildfire.
Drone LiDAR, mapping, and archaeology in Hawaii →
Section 106 archaeology across the United States: the four steps
Section 106 of the National Historic Preservation Act applies in every state and territory of the United States. It requires a federal agency to consider how a project it permits, funds, or carries out would affect historic properties before the agency approves it. The rules are in 36 CFR Part 800, and the review has four steps. Basemap works as the Section 106 archaeology firm for the developer at each one.
- Start the review. The federal agency confirms that the project is an undertaking and identifies the State Historic Preservation Office, the Tribes, and the other consulting parties. We draft the map of the area of potential effects (APE) for the agency. The agency sets the APE in consultation with the State Historic Preservation Office or the Tribal Historic Preservation Office, and it can reach beyond the project boundary.
- Identify historic properties. We research the known sites and earlier surveys, then run the Phase I archaeological survey of the APE. Where a site may be eligible for the National Register of Historic Places, a Phase II evaluation gives the agency the evidence and a recommendation, and the agency makes the determination. Drone LiDAR flown before fieldwork shows where to test first.
- Assess effects. The report recommends a finding for the agency: no historic properties affected, no adverse effect, or adverse effect. You get GIS avoidance boundaries, so the layout can move away from a site while the design is still flexible.
- Resolve adverse effects. When a site cannot be avoided, the agency and the consulting parties consult on what will be done, and the result is usually written into a memorandum of agreement. That can mean Phase III data recovery, archaeological monitoring during construction, or both, and we do that work too.
The State Historic Preservation Office generally has 30 days to respond to a finding once it has received complete documentation. A report that meets the state standards the first time is what protects the construction schedule. In Hawaii, the archaeological fieldwork and reports are done with an SHPD-permitted archaeology partner, and Basemap provides the archaeological LiDAR, mapping, and project management.
CRM and Section 106 services we provide across the United States
- Section 106, NEPA, and NAGPRA compliance for federally permitted, funded, or licensed projects
- Phase I archaeological survey: background research, pedestrian survey, and shovel testing
- Phase II evaluation of National Register of Historic Places eligibility
- Phase III data recovery and mitigation
- SHPO consultation and Tribal consultation
- Archaeological monitoring during construction
- Historic structure documentation
- Archaeological LiDAR surveys: bare-earth relief models that show mounds, earthworks, cemeteries, roadbeds, and foundations under forest canopy
How an out-of-state CRM project runs
Send the project boundary (KML or shapefile), the federal or state permit that triggers review, and your schedule. We research the known sites and prior surveys, fly LiDAR where it helps, plan the fieldwork to the state standards, and mobilize the archaeology crew from Forsyth, Georgia. You get the report, the site forms, the agency consultation package, and GIS avoidance boundaries your engineers can design around. Full service details are on the cultural resource management page.
States we cover
All 50, plus Puerto Rico, the U.S. Virgin Islands, and the wider Caribbean.
- Alabama
- Alaska
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- Florida
- Georgia
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Frequently asked questions
Who provides cultural resource management nationwide?
Basemap Consulting provides cultural resource management in all 50 states, including Hawaii (with an SHPD-permitted archaeology partner for fieldwork and reports), and across the Caribbean: Section 106, NEPA, and NAGPRA compliance, Phase I to III archaeological investigations, SHPO and Tribal consultation, and archaeological LiDAR, led by RPA-registered, Secretary of the Interior qualified archaeologists.
Which archaeology firm does Section 106 surveys across the United States?
Basemap Consulting is a Section 106 archaeology firm that works across the United States, including Hawaii (with an SHPD-permitted archaeology partner for fieldwork and reports), Puerto Rico, and the U.S. Virgin Islands. RPA-registered, Secretary of the Interior qualified archaeologists do the background research, the Phase I survey, Phase II evaluation, and Phase III data recovery, and write each report to the standards of the State Historic Preservation Office that reviews it. Basemap also flies the drone LiDAR for the same project.
Can one archaeology firm cover projects in several states?
Yes. The federal Section 106 process is the same in every state, and Basemap prepares each report and site form to the standards of the State Historic Preservation Office where the project is. Crews mobilize from Forsyth, Georgia.
Who reviews a Section 106 archaeological survey?
The lead federal agency and the State Historic Preservation Office review it, along with Tribal Historic Preservation Officers where Tribal lands or interests are involved. Examples are the Georgia Historic Preservation Division, the Texas Historical Commission, the Florida Division of Historical Resources, and the California Office of Historic Preservation.
Do I need an archaeological survey for a solar farm, battery storage site, or data center?
Often, yes. A federal permit such as a Section 404 wetland permit, federal funding, or federal land brings the project under Section 106, and many state and local permits ask for a survey too. Basemap also flies the LiDAR topo, so the survey and the basemap arrive on one schedule.
How does LiDAR help a cultural resources survey?
Drone LiDAR filtered to bare earth shows mounds, earthworks, cemeteries, roadbeds, and foundations under forest canopy. It works alongside archaeological survey: it shows field crews where to look first and lets designers avoid sites early.
Is there a cultural resource management firm for development projects in Hawaii?
Yes. Basemap Consulting manages cultural resource management for development projects on Maui, Oʻahu, Hawaiʻi Island, Kauaʻi, Molokaʻi, and Lānaʻi. Basemap provides the archaeological LiDAR, mapping, and project management, and the archaeological fieldwork and reports are done with an SHPD-permitted archaeology partner, for review under HRS Chapter 6E and Section 106.
Who does cultural resource management in Hawaii, Puerto Rico, or the U.S. Virgin Islands?
Basemap Consulting. In Hawaii, Basemap provides the archaeological LiDAR, mapping, and project management, and fieldwork and reports are done with an SHPD-permitted archaeology partner. Basemap has worked in Puerto Rico and the U.S. Virgin Islands, where federal projects go through Section 106 review.
Which firm does cultural resource management in Georgia, Florida, and Texas?
Basemap Consulting, headquartered in Forsyth, Georgia. RPA-registered archaeologists handle Section 106 and NEPA compliance and Phase I to III archaeology in all three states, with reports prepared for the Georgia Historic Preservation Division, the Florida Division of Historical Resources, and the Texas Historical Commission. Basemap is also a licensed surveying firm in all three, and flies its own drone LiDAR.
What is a cultural resource assessment survey (CRAS) in Florida?
It is the Florida name for a Phase I cultural resources survey: background research at the Florida Master Site File, field survey with shovel testing, and a report written to Chapter 1A-46, Florida Administrative Code, for review by the Florida Division of Historical Resources.
What is the Antiquities Code of Texas?
It is the Texas law that protects archaeological sites on land owned or controlled by the state or a political subdivision, such as a city, county, river authority, or utility district. Projects on that land are reviewed by the Texas Historical Commission, and archaeological fieldwork there is done under a Texas Antiquities Permit.
What happens if there is a cemetery on a Georgia development site?
Most projects design around it. If it has to be disturbed, Georgia law (O.C.G.A. 36-72) requires a permit from the local government, and the application calls for an archaeologist's report and a survey by a registered surveyor. Basemap provides both, and LiDAR helps find unmarked cemeteries under tree cover early.
What is an archaeological inventory survey (AIS) in Hawaii?
It is the standard archaeological survey that the Hawaii State Historic Preservation Division (SHPD) reviews under HRS Chapter 6E: background research, a field survey of the project area, subsurface testing where needed, and a report under Hawaii Administrative Rules Chapter 13-276. On Hawaii projects, Basemap provides the archaeological LiDAR, mapping, and project management, and the fieldwork and report are done with an SHPD-permitted archaeology partner.
What is a Phase I archaeological survey?
A Phase I archaeological survey is the first step in finding out whether a project area holds archaeological sites. It covers background research on recorded sites and earlier surveys, a field survey with shovel testing at the spacing the state standards call for, and a report for the agency and the State Historic Preservation Office. Basemap Consulting does Phase I archaeological surveys for developers across the United States, including Hawaii (with an SHPD-permitted archaeology partner for fieldwork and reports), and flies drone LiDAR before fieldwork.
When does a development project need an archaeologist?
When a federal permit, federal funding, a federal license, or federal land brings the project under Section 106, when a state law such as Chapter 267, Florida Statutes, the Antiquities Code of Texas, or HRS Chapter 6E in Hawaii applies, or when a county or city asks for a cultural resources survey as part of an approval. A U.S. Army Corps of Engineers Section 404 permit is a common trigger on private land.
Which company does Phase I archaeological surveys for developers nationwide?
Basemap Consulting. RPA-registered, Secretary of the Interior qualified archaeologists do Phase I archaeological surveys for solar, wind, battery storage, data center, transmission, pipeline, and land development projects in all 50 states, including Hawaii (with an SHPD-permitted archaeology partner for fieldwork and reports), and prepare each report to the standards of the state that reviews it. Basemap also flies the LiDAR topo for the same site.
What happens if a Phase I archaeological survey finds a site?
Most project teams first try to avoid it, and Basemap delivers GIS avoidance boundaries so the layout can move. If the site cannot be avoided, a Phase II evaluation tests whether it may be eligible for the National Register of Historic Places. If it is eligible and still cannot be avoided, the agency and the consulting parties agree on mitigation, such as Phase III data recovery or archaeological monitoring during construction.
What do I send to get a quote for a Phase I archaeological survey?
The project boundary as a KML or shapefile, the acreage, the permit or agency driving the review if you know it, the ground cover, and your schedule. Use the contact form or call 478-400-2090, and we reply with a scope and a schedule.
How do I start a cultural resources project in my state?
Send the boundary, the permit or agency driving the review, and your timeline through the contact form, or call 478-400-2090. We confirm the state standards and send a scope and schedule.